Infrastructure
Engineering and transport infrastructure
The hub's railway, energy and external supporting infrastructure, developed in sync with the project implementation and the development plans of Alatau City.
The G-Trans Service hub is one of the key growth points of Alatau City. The development of railway, engineering and transport infrastructure is synchronised with the project implementation and the city's development plans.
Railway infrastructure
| Facility | Parameters | Status |
|---|---|---|
| Railway connection to Kairat station | 1,332 m | Documentation developed, state review passed, construction begun |
| Railway connection to Zhetygen station | 121.5 m | Documentation developed, state review passed, construction begun |
| GTS connecting track | Under design | Project documentation development |
The hub's railway connection scheme
Completed works
Construction and installation works began in June 2025.
- Reconstruction of the 10 kV overhead line and fibre-optic communication links
- Earthworks over a section of more than 4.5 km
- Construction of the subgrade and track base
- Preparation of the construction site
Power supply
| Facility | Parameters | Status |
|---|---|---|
| Phase 1 power supply line | 5 MW, 10 kV | Documentation and state review completed |
| Line length | about 9 km | Design completed |
External infrastructure
External supporting infrastructure
The development of external road, energy and gas infrastructure is planned as part of the development of Alatau City.
| Infrastructure | Parameters | Status |
|---|---|---|
| Roads | over 10 km | Planned as part of the external infrastructure |
| Electricity (prospective) | up to 100 MW | Planned as part of Alatau City development |
| Gas supply | up to 20,000 m³/h | Planned as part of Alatau City development |