Skip to content

Alatau City · Kazakhstan

G-Trans Service transport, logistics and industrial hub in Alatau City

An integrated platform for logistics, industry and international trade at the crossroads of key Eurasian transport corridors.

About the project

A single industrial and logistics ecosystem

G-Trans Service is developing a transport, logistics and industrial hub in Alatau City. The project brings together a container terminal, a logistics park, an industrial park, a general cargo terminal, a grain terminal and railway infrastructure.

The hub is being shaped as a single ecosystem for handling, storing, distributing and processing cargo, serving the markets of Kazakhstan, China, Central Asia, Europe, the Middle East and the Caucasus.

0
ha
Prospective development area of the hub
up to 0
TEU / year
Potential container terminal capacity
over 0
Potential warehouse infrastructure
over 0
Potential production space

Strategic location

A strategic location in Eurasia

The G-Trans Service hub is located in Alatau City, in the immediate vicinity of the Almaty agglomeration and Kazakhstan's key railway routes. The location provides access to routes to China, Central Asia, Europe, the Middle East, Türkiye and the Caucasus.

40 km
to Almaty

Proximity to Kazakhstan's largest consumer market and business centre.

270 km
to Altynkol–Khorgos

Access to the key railway crossing on the border with China.

Dostyk · Altynkol
access to lines

Integration with the main routes of international trade.

Bypass railway
Almaty line

Development of freight flows bypassing the urban agglomeration.

Transport directions
ChinaEurope (Middle Corridor)Central AsiaMiddle EastTürkiyeCaucasusRussia
More about the location
Map of the G-Trans Service hub location in Alatau City and the Eurasian transport corridors

Current implementation status

The project is in active implementation

Key design works have been completed, positive state expert reviews have been obtained for the railway infrastructure, and construction and installation works on the railway connections and the connecting track have begun.

Строительно-монтажные работы на площадке хаба G-Trans Service
Design

Master plan

Royal HaskoningDHV developed the master plan for the transport and logistics zone; Industrial Pro developed the master plan for the industrial park.

Documentation

Project documentation

Design and estimate documentation has been developed for the railway connections to the Zhetygen and Kairat stations and for the GTS connecting track.

Expert review

State expert review

Positive state expert reviews have been obtained for the key railway infrastructure facilities.

Construction

Construction and installation works

Works began in June 2025: reconstruction of the 10 kV overhead line and fibre-optic links, earthworks over more than 4.5 km, and construction of the subgrade and track base.

Energy

Power supply

Design documentation and state expert review of the 5 MW, 10 kV external power supply line, about 9 km long, have been completed.

Financing

Financing

Applications for KZT 19.5 billion have been submitted to DBK and IDF: KZT 13 billion in borrowed funds and KZT 6.5 billion in equity.

External infrastructure

External supporting infrastructure

The G-Trans Service hub is one of the key growth points of Alatau City. The development of external engineering and transport infrastructure is synchronised with the project implementation and the city's development plans.

InfrastructureParametersStatus
Railway connection to Kairat station1,332 mDocumentation developed, state review passed, construction begun
Railway connection to Zhetygen station121.5 mDocumentation developed, state review passed, construction begun
Roadsover 10 kmPlanned as part of the external infrastructure
Electricityup to 100 MWPlanned as part of Alatau City development
Gas supplyup to 20,000 m³/hPlanned as part of Alatau City development
Phase 1 power supply5 MWDocumentation and state review completed
More about the infrastructure
Ситуационная схема железнодорожных примыканий хаба к станциям Жетыген и Кайрат

Ситуационная схема примыкания путей ТЛХ к станциям Жетыген и Кайрат

Project support

Institutional support

The project has received support from key national and regional institutions. It is being coordinated with government bodies, development institutions, the Alatau City project office and JSC NC Kazakhstan Temir Zholy.

  • President of the Republic of Kazakhstan
  • Presidential Administration
  • Investment Promotion Council (Investment Headquarters)
  • Alatau City Development Project Office
  • Akimat of the Almaty Region
  • JSC NC Kazakhstan Temir Zholy (KTZ)

Ready to discuss taking part in the project?

Investment, residency, warehouse leasing, industrial and logistics partnership — we are open to dialogue.